Offshore Activity
APPRAISAL WELL
Operator:
Providence Resources Plc
Authorisation:
Licence Option 08/02
Blocks:
Activity:
Appraisal Well
Well Identification:
48/24-J
Vessel Name/Call Sign:
TransOcean Arctic III / YJSU9
Owned/Operated by:
Transocean
Location:
51°12’ 04.073” N 08º 17’ 13.38” W
Easting 549812.97
Northing 5672549.86
(UTM zone 29 (9° West) Ellipsoid:
International 1924, Datum ED50)
Reference Drawings:
N/A
Start Date:
Early October 2011
Duration:
45 -75 Days
Expected Completion:
Nov - Dec 2011
Comments:
PIPELINE SURVEY
Operator:
PSE Kinsale Energy Limited
Authorisation:
Blocks:
Activity:
Well Identification:
N/A
Vessel Name/Call Sign:
Celtic Explorer / EIGB
Owned/Operated by:
Marine Institute, Rinville, Oranmore, Co. Galway
Location:
The survey will take place along the existing pipeline routes in the Celtic Sea:-
Between the shore-line at Inch Beach in County Cork and Platform Alpha Lat 510 22' 14.953" N Long 070 56' 41.770" W
Between Platform Alpha and the Seven Heads Manifold Lat 510 11' 48.489"N Long 080 20' 03.087"W
Between Platform Bravo Lat 510 21' 38.913"N Long 080 00' 55.769"W and the Ballycotton Wellhead Lat 510 27' 07.000"N Long 080 07' 28.407"W
Between Platform Bravo and the South West Kinsale Wellheads Lat 510 19' 37.609"N Long 080 05' 54.358"W
Start Date:
August 27th 2011
Duration:
10 Days approx
Expected Completion:
September 2010
Comments:
All vessels in particular fishing vessels are asked to give the MV Celtic Voyager a wide berth of at least one mile.
SEISMIC SURVEY
Operator:
Providence Resources Plc
Authorisation:
PPL 01/10 & FEL 04/08
Blocks:
Blocks 35/ 1, 2, 3, 4, 5, 6, 7, 8, 9, 10
Activity:
3D Seismic Acquisition Survey
Well Identification:
N/A
Vessel Name/Call Sign:
M/V Polarcus Samur/ C6XK8
Owned/Operated by:
Polarcus (UK) Ltd
Location:
The survey operational area is enclosed by the following coordinates:
A. 53° 00’ 0.00’’ N 12° 54’ 0.00’’ W
B. 53° 00’ 0.00’’ N 12° 06’ 0.00’’ W
C. 52° 45’ 0.00’’ N 12° 06’ 0.00" W
D. 52° 45’ 0.00’’ N 12° 54’ 0.00’’ W
Reference Drawings:
N/A
Start Date:
On or after 18 July 2011
Duration:
10 - 20 Days
Expected Completion:
Mid August 2011
Comments:
Planned data acquisition includes 3D seismic field data and navigation data including several water velocity measurements over the survey area. A record of any Cetacean activity from visual sightings and PAM equipment
SEISMIC SURVEY
Operator:
Lansdowne Oil & Gas Plc
Authorisation:
PPL 01/09
Blocks:
Blocks
49/11 & 49/12
48/18 & 48/19
48/21, & 48/22
Activity:
3D Seismic Acquisition Survey in three areas
Well Identification:
N/A
Vessel Name/Call Sign:
M/V Polarcus Samur/ C6XK8
Owned/Operated by:
Polarcus (UK) Ltd
Location:
The survey operational area is enclosed by the following coordinates:
A. 51° 06’ 30’’ N 08° 58’ 01’’ W
B. 51° 30’ 55’’ N 07° 39’ 51’’ W
C. 51° 39’ 59’’ N 07° 46’ 57" W
D. 51° 15’ 36’’ N 09° 04’ 59’’ W
Reference Drawings:
N/A
Start Date:
On or after 22 June 2011
Duration:
20 Days
Expected Completion:
Mid July 2011
Comments:
Planned data acquisition includes 3D seismic field data and navigation data including several water velocity measurements over the survey area. A record of any Cetacean activity from visual sightings and PAM equipment
ACOUSTIC SURVEY & ROV DEPLOYMENT
Operator:
Shell E & P Ireland Limited (SEPIL)
Authorisation:
Corrib Petroleum Lease
Block:
18/20 & 18/25
Vessel Name/Call Sign: Acergy Petrel/ LXDJ
Owned/Operated by:
Location :
Start Date: Mid June 2011
Duration: Approx 2 weeks
Expected Completion: End June 2011
Comments: Full details can be found in Marine Notice No. 31 of 2011.
Locations:The survey will commence along the pipeline route
Coordinate system:WGS84
Projection : UTM Zone 29
9° West
FROM:
Latitude: 54° 20.34’ N
Longitude: 11° 03.51’ W
TO:
Latitude: 54° 17.15’ N
Longitude: 09° 50.8’ W
SEISMIC SURVEY
Operator:
Providence Resources Plc
Authorisation:
PPL 01/10
Blocks:
Blocks 48/ 22,23,24,27,28,29,30 & 49/21,26
Activity:
3D Seismic Acquisition Survey
Well Identification:
N/A
Vessel Name/Call Sign:
M/V Polarcus Samur/ C6XK8
Owned/Operated by:
Polarcus (UK) Ltd
Location:
The survey operational area is enclosed by the following coordinates:
A. 51° 15’ 0.00’’ N 08° 48’ 0.00’’ W
B. 51° 15’ 0.00’’ N 07° 59’ 0.00’’ W
C. 51° 07’ 0.00’’ N 07° 59’ 0.00" W
D. 51° 07’ 0.00’’ N 08° 48’ 0.00’’ W
Reference Drawings:
N/A
Start Date:
On or after 28 May 2011
Duration:
10 - 18 Days
Expected Completion:
End June 2011
Comments:
Planned data acquisition includes 3D seismic field data and navigation data including several water velocity measurements over the survey area. A record of any Cetacean activity from visual sightings and PAM equipment
SEISMIC SURVEY
Operator:
San Leon Energy Plc
Authorisation:
FEL 1/04 (Porcupine)
Blocks:
Blocks 26/27(p), 26/28, 35/2(p) & 35/3(p)
Activity:
3D Seismic Acquisition Survey
Well Identification:
N/A
Vessel Name/Call Sign:
M/V Ramform Vanguard / C6TU8
Owned/Operated by:
PGS Exploration (UK) Ltd
Location:
The survey operational area is enclosed by the following coordinates:
1. 53° 04’ 52.27’’ N 12° 48’ 39.39’’ W
2. 53° 12’ 41.49’’ N 12° 27’ 02.98’’ W
3. 53° 08’ 25.56’’ N 12° 29’ 10.97’’ W
4. 52° 58’ 10.75’’ N 12° 44’ 33.61’’ W
5. 53° 01’ 10.08’’ N 12° 50’ 06.76’’ W
6. 53° 03’ 39.31’’ N 12° 46’ 24.90’’ W
Reference Drawings:
N/A
Start Date:
29 April 2011
Duration:
3 - 4 Weeks
Expected Completion:
15 May 2011
Comments:
The vessel will tow ten 6000m long solid streamers at a 100m spacing during the acquisition. This will restrict the ability to manoeuvre. Other vessels are therefore requested to give this operation a wide berth.
WELL INTERVENTION WORK
Operator:
Shell E & P Ireland Limited (SEPIL)
Authorisation:
Corrib Petroleum Lease
Block:
18/20 & 18/25
Vessel Name/Call Sign: SEDCO 711/ ELBU6
Owned/Operated by: Transocean
Location :
Start Date: Q2 2011
Duration: April/May - September 2011
Expected Completion: September 2011
Comments: Activities of the Sedco 711 will involve intervention work at a number of wells in the Corrib Field
Locations:
Coordinate system:WGS84
Projection : UTM Zone 29
9° West
18/20-2z (P1) well surface coordinates:
Latitude: 54° 20’ 20.170” N
Longitude: 11° 03’ 26.819” W
18/25-2 (P2) well surface coordinates:
Latitude: 54° 19’ 09.119” N
Longitude: 11° 02’ 54.963” W
18/20-4 (P4) well surface coordinates:
Latitude: 54° 20’ 19.349” N
Longitude: 11° 03’ 26.175” W
18/20-5 (P6) well surface coordinates:
Latitude: 54° 20’ 18.224” N
Longitude: 11° 03’ 26.705” W
Manifold Centre surface coordinates:
Latitude: 54° 20’ 20.391” N
Longitude: 11° 03’ 30.751” W
WELL INSPECTION
Operator:
Shell E & P Ireland Limited (SEPIL)
Authorisation:
Corrib Petroleum Lease
Block:
18/20 & 18/25
Vessel Name/Call Sign: Normand Subsea/ 2CQP8
Owned/Operated by: Subsea 7
Location :
Start Date: End May 2011
Duration: 4 - 10 Days
Expected Completion: Early - Mid June 2011
Comments: Operations with the Normand Subsea will include surveys of four
wells in the field.
Locations:
Coordinate system:WGS84
Projection : UTM Zone 29
9° West
18/20-6z (P101) well surface coordinates:
Latitude: 54° 20’ 20.705” N
Longitude: 11° 03’ 26.154” W
18/20-3 (P3) well surface coordinates:
Latitude: 54° 20’ 51.418” N
Longitude: 11° 02’ 15.465” W
18/20-4 (P4) well surface coordinates:
Latitude: 54° 20’ 19.349” N
Longitude: 11° 03’ 26.175” W
18/25-3 (P5) well surface coordinates:
Latitude: 54° 19’ 11.136” N
Longitude: 11° 04’ 15.419” W
Manifold Centre surface coordinates:
Latitude: 54° 20’ 20.391” N
Longitude: 11° 03’ 30.751” W
MULTIBEAM & SIDE SCAN SONAR SURVEY
Operator:
Providence Resources
Authorisation:
Blocks:
Blocks 50/11 Hook Head, 48/24 Barryroe,
Activity:
Multibeam & Side Scan Sonar Survey
Well Identification:
N/A
Vessel Name/Call Sign:
R/V Celtic Voyager / EIQN
Owned/Operated by:
Marine Institute
Location:
The survey operational area is enclosed by the following coordinates:
Hook Head
A. 51° 36.412 N 06° 56.865 W
B. 51° 36.350 N 06° 53.398 W
C. 51° 34.191 N 06° 53.504 W
D. 51° 34.253 N 06° 56.962 W
Barryroe
A. 51° 13.206 N 08° 18.952 W
B. 51° 13.182 N 08° 18.516 W
C. 51° 13.027 N 08° 18.550 W
D. 51° 13.047 N 08° 18.984 W
Reference Drawings:
N/A
Start Date:
29 March 2011
Duration:
2 Weeks
Expected Completion:
12 April 2011
Comments:
The vessel will tow a side scan sonar and magnetometer from time to time with cables of up to 300m long.